CAM-I City Scape
city_scape.jpg
CAM-I is Recognized Worldwide
For proven advanced management solutions
previous arrow
next arrow

Who is CAM-I

Download the PDF version

Global leadership in Cost, Process, and Performance Management

Consortium for Advanced
Management - International

Over Five Decades of Industry-led Collaborative Research

Who We Are
  • CAM-I, the Consortium for Advanced Management-International, is an international non-profit consortium, founded with US Department of Commerce support in 1972. For over five decades CAM-I has brought quantifiable value by partnering with over seventy national and international organizations in helping to improve their business operations while contributing to their employee’s personal professional growth and business acumen. In addition to partnering with commercial and public sector organizations, CAM-I is a knowledge partner with several universities and industry groups in USA, United Kingdom, Japan, Canada, Mexico, South Korea, India, and Australia.
  • There are many technology incubators, CAM-I is one of the premier management incubators.

MISSION OF CAM-I: To foster operational excellence in organizations by:

  • Developing collaborative solutions for the most urgent current and future problems that hinder the journey to operational excellence
  • Enhancing capability of member organizations through people development
  • Exposing organizations to thought leaders
  • Augmenting capabilities through information dissemination and training for improving performance

© 2025 CAM-I. All Rights Reserved

2

CAM-I IP
Process

Identify issues and challenges facing your organization.
Co-create actionable practical solutions, new models and techniques.
Apply solutions in real world setting.
Archive the knowledge on the CAM-I portal.
Disseminate knowledge.
Implement new knowledge through training.
© 2025 CAM-I. All Rights Reserved3

Organizations who partner with CAM-I

  • Acorn Systems
  • ALTA Management, Japan
  • Avnet
  • BAE Systems
  • Bank of America
  • Barclays Bank PLC - UK
  • BCH Electric Limited – India
  • Cambia Health Solutions
  • Caterpillar
  • Cherry Bekaert LLC
  • Chrysler
  • City of Rockhill
  • Clifton Consulting Group LLC
  • CPA Alberta
  • CPA Canada
  • Decimal - Canada
  • Deere & Company
  • DFW Airport
  • DIGITECH Services Inc.
  • Eastman Chemicals
  • ERS Texas
  • Gayle Force Consulting
  • Godrej Industries – India
  • Grant Thornton
  • Harley-Davidson
  • Hitachi Capital (UK) PLC
  • Honda of America
  • Honeywell International
  • IBM
  • International Business Consulting
  • Johnson Controls
  • King County, Washington
  • Landmark Decisions Inc., Canada
  • Lean Werx LLC
  • Lockheed Martin
  • Ministry of Defense, UK
  • NASA
  • Navistar
  • Northrop Grumman
  • ON Semiconductor
  • Permian Tank
  • Pilbara Group, Inc.
  • Pinnacle West
  • Porsche
  • Procter & Gamble
  • Raytheon
  • Rockwell Collins
  • Royal Australian Navy
  • SAP AG – Germany
  • SAS Institute
  • Sikich
  • Shell Oil
  • STRATrockers LLC
  • TATA Consultancy Services India
  • Texas Instruments
  • The Boeing Company
  • Transportation Security Agency
  • University of Alberta, Edmonton
  • U.S. Air Force
  • U. S. Army
  • U. S. Coast Guard
  • U. S. Department of Agriculture
  • U. S. Department of Education
  • U. S. Department of Treasury
  • U.S. Department of Navy
  • U. S. Health and Human Services
  • U. S. Patent and Trademark Office
  • WesleyQuest , Korea
  • ViON
  • Whirlpool Corporation
  • Young Advisory Ltd

© 2025 CAM-I. All Rights Reserved

4

University and Professional Affiliations

Technical and Knowledge Partners

Great Lakes Institute of Management – Chennai
Confederation of Indian Industries (CII)
International Federation of Accountants

University and College Affiliations

Arizona State University
Babson Collge
The University of Akron
Weber State University
University of Bristol

© 2025 CAM-I. All Rights Reserved

5

Significant Present and Past Interest Groups

Current Special Interest Groups

  • Value, Cost and Profitability Management
  • Supply Chain Management
  • Environmental Sustainability
  • Artificial Intelligence

Some of the past Special Interest Groups

  • Digitalization
  • Principle Based Value Framework
  • Improving Efficiency/Effectiveness in the Finance Function

Some of the past Special Interest Groups

  • Cost Management, Activity Based Costing, Target Costing
  • Integrated Risk & Value Management
  • Performance Management
  • Intelligent Data Quality Management
  • Planning and Budgeting
  • Capacity Management
  • Health Care
  • Change Adaptation and Learning
  • Armed Services

© 2025 CAM-I. All Rights Reserved

6

CAM-I Training

  • Improving the Efficiency and Effectiveness
    In the Finance Function
  • Performance Management Framework
  • Closed Loop Planning and Budgeting
  • Activity Based Costing/Management
  • Power Business Intelligence
  • Target Costing
  • Cloud Computing
  • Cloud Operations
  • Value Analysis
  • Integrated Risk and Value Management
  • Supply Chain Management
  • Strategic Cost Management
  • Artificial Intelligence
  • Project Management
  • Capacity Management
  • Lean Leader
  • Six Sigma
  • Navigating Change

CAM-I is NASBA accredited, and all attendees receive continuing professional education (CPE) credits that certify numerous professional bodies’ continuing education requirements.

© 2025 CAM-I. All Rights Reserved

7

Examples of

CAM-I Work

© 2024 CAM-I. All Rights Reserved

8

Cost and Profitability Management

Issue:
Strategic Cost and Profitability Value Management Roadmap – How do we utilize CAM-I body of knowledge to further innovate the application of traditional cost models.
Link Principle Based Value Framework to Value analysis.
Linkage of Environmental sustainability to cost models and supply chain.

Led by: The CAM-I Cost and Profitability Management Group

Project Purpose: Review methodologies and recent work to ensure the relevance to rapid changes that are occurring across industries today. By focusing on understanding additional stakeholders and their importance to an organization, along with a redefinition of value, we are re-aligning existing CAM-I methodologies and models to help organizations deliver sustainable stakeholder value. CAM-I understands the importance of Industry 4.0. As a first step in contributing to industry 4.0 learning and body of knowledge, we will focus on linking CAM-I’s existing Target Costing methodologies to Industry 4.0.

Deliverables:
Book - Value Quest - Driving Profit and Performance by Integrating Strategic Management Processes
Total Cost to Serve Model, Supplier Cost methodology, Customer profitability modes

© 2025 CAM-I. All Rights Reserved

9

Integrated Risk and Value Management

Issue: Risk Management was focused on preventing and reducing operational loss through risk avoidance and risk transfer.

Led By: The CAM-I Integrated Risk and Value Management Group

Solution: ERM approach that enriches the conversation with stakeholders by evaluating the strengths and weaknesses of a strategy, and how well that strategy aligns with the organization’s missions and goals.

Publications:
“The CAM-I Risk-Value Curve: Understanding Your Risk Appetite to Create Value” (guideline)

“The Risk-Value Curve: How to optimize Risk and generate value for your organization” (article)

“Integrated Risk and Crisis Management” (paper)

Risk-value curve: enterprise value against risk level, with the risk optimization point at the peak

© 2025 CAM-I. All Rights Reserved

10

Performance Management Framework

Issue: The demand for improved organizational performance along with increased accountability has led to an increase in expectation around the management of performance. However, this has led to a great diversity of views as to what exactly constitutes Performance Management.

Led By: the Performance Management Interest Group (PMIG)

Solution Development/Application: The research led to the development of an integrated Performance Management Framework (PMF) to assist in strategy execution. The PMF:

  • Conducts an organizational readiness assessment
  • Identifies maturity gaps in business capabilities
  • Recommends specific techniques to close maturity gaps
  • Directionally suggests appropriate measures to track improvement
  • Creates a performance focused culture by identifying key initiatives that will make a significant impact on improving performance

Deliverables: Emerging Issues Paper; Application Guideline and Case Study; Implementation Guidebook; in person and online Awareness Training and Implementation Workshop; PMF Facilitator Certification Program.

The Performance Management Framework (PMF) is a holistic methodology to evaluate and improve organizational performance.

STRATEGYREADINESSCAPABILITIESTECHNIQUESMEASURESFocused initiatives to improve strategy execution

ApplicationsThe Performance Management Framework has been extensively implemented by member companies and other CAM-I Interest Groups. A list of implementation organizations is provided on the CAM-I website.

© 2025 CAM-I. All Rights Reserved

11

Improving Efficiency/Effectiveness in the Finance Function

Issue: Organizations are being continuously challenged by customers, shareholders, governing bodies and internal business partners to develop and implement new ways of working that improve effectiveness and productivity to maximize value creation. National Governments, Defense and Commercial customers have never been more challenged with budget constraints as a result of the Global pandemic therefore its an imperative for organizations to develop more agile, less bureaucratic processes and revised ways of working.

Led by: The CAM-I Developing New Ways of Working to Improve Efficiencies Group

Project Purpose - To examine methods of benefit realization and embedding a culture of effectiveness through sharing and collaborating with CAM-I members and extended Industry and Academic partners.

Deliverables: In progress.

  1. Project Academic Research – what does the theory say and how has it evolved over time
  2. Review automation/elimination of processes to remove non- value add activity
  3. Review business partnering models to understand how to extract the most value from this
  4. Undertake a SWOT analysis
  5. Undertake case studies and identify best practice

© 2025 CAM-I. All Rights Reserved

12

Supply Chain Management

  • Issues: Focus on five contemporary challenges facing supply chains:
    • How to best prepare supply chains from major disruptions such as COVID-19?
    • What impact will the USA re-joining the Paris Climate Accord have on the design of supply chains?
    • How will BREXIT and colder relations with Beijing shake up traditional supply chains?
    • What supply chain vulnerabilities have been exposed by recent cyber security breaches?
    • How will industrial revolution 4.0 change supply chain principles and practices?
  • Purpose of Project:
    • Propose changes to current supply chain practices such as single-sourcing or out-sourcing.
    • Determine whether the current supply chains have the requisite flexibility to deal with new challenges.
    • Catalog best practices in supply chain management to increase resiliency and mitigate risks.
    • How organizations are using data analytics to improve visibility and productivity across the supply chain.
  • Deliverables: TBD (Book, Monograph or White Paper)

© 2025 CAM-I. All Rights Reserved

13

Principle Based Value Framework

Issue: Organizations often struggle with defining, quantifying and demonstrating the value that they create. This is particularly true for internal business enabling functions. The nature of these functional areas is such that the activities and processes being performed are often hard to measure from a “value add” perspective and it is difficult to link any value being created to the resources providing the value.

Led By: The CAM-I Cost and Profitability and value analysis group

Solution: To develop a framework that will enable member organizations to consistently demonstrate the value business support functions bring to an organization and thereby allow cost / value trade-offs to be quantified and considered.

Deliverable: Principle Based Value Framework method

Business Unit Objectives & Needs surrounded by Purpose, Services, Delivery and Measure

© 2025 CAM-I. All Rights Reserved

14

Value Analysis

  • Issue: organizations to channel their product/service development activities to areas which provide the maximum value for all stakeholders internal and external. Consider relative importance to employees, the general public, etc. (X axis)
  • Led By: The CAM-I Cost and Profitability Group
  • Solution Development/Application: identify the relationship between spending and an organizational objective’s functional requirements, as defined by the customer and impacted by other stakeholders, maximize value capture during the design stage of new product/service development
  • Deliverables:
    A workshop to teach the value analysis process.
    Target Value Process
Relative cost against relative importance: candidates for cost reduction and for additional investment

The size of the bubbles reflects the size of the revenue potential or the revenue impact. The size could also reflect something non-Financial (societal impact, service capacity, employee satisfaction).

© 2025 CAM-I. All Rights Reserved

15

Principle Based Value Framework
Demonstrating the value of the enabling function
Value pyramid

Value pyramid: initial state (comply, essential, discretionary) transitions to the ideal state, where services move to essential and comply

© 2025 CAM-I. All Rights Reserved

16

Activity Based Costing

The CAM-I Cross

Issue: Under traditional accounting methods the allocation
of overheads distorts cost of products and services

Led By: The CAM-I Cost Management Group

Solution Development/Application: A methodology that measures the cost and performance of cost objects, activities and resources.

Deliverables:
Total Cost to Serve Model
Building an Activity-Based Model for Environmental footprint
Pilot Project to Implement Environmental Activity-Based Costing/ Management Principles
Activity Based Management Design Framework
Book - The Closed Loop - Implementing Activity Based Planning and BudgetingThe 60 Minute ABC Book
An ABC Manager’s Primer

The CAM-I Cross: resources, activities and cost objects, with cost drivers and performance measures

© 2025 CAM-I. All Rights Reserved

17

Target Costing

Issue : How do the Japanese use this new technique called target costing to improve product development and profitability and how can we implement it in our companies?

Led By: The CAM-I Target Costing Group

Solution Development/Application: Translation of Japanese Literature on Target Costing; A oneyear intensive study of US companies, and Best Practices Study Visit to Japan

Deliverables:
Translation of Japanese Literature on Target Costing, Target Costing and Hitting the Target Books; Supplier Cost Methodology, Managing Environmental Sustainability Using Target Costing Principles, Addressing Commodity Price Volatility in Product Development through a mature Target Costing Process and more

The Target Costing implementation framework tailored by CAM-I provides the basis to attain desired “should cost”. It requires sound Knowledge of customer perception of value, design impact of components and accuracy in supplier cost estimates.

Shifting the focus: percent of life-cycle cost committed against cost expended, by phase of product development

© 2025 CAM-I. All Rights Reserved

18

Closed Loop Planning & Budgeting

Issue: Effective Planning and Budgeting continues to be one of the biggest challenges facing today’s organizations and is often viewed as a non-value-added process.

Led By: The CAM-I Activity Based Planning & Budgeting Interest Group

Solution Development/Application: The research led to the development of the Closed Loop Methodology with more emphasis on planning effort and balancing resource capacity. Models developed with the methodology are used to evaluate process improvement initiatives, obtain a better understanding of costs/profitability, and develop more realistic budgets.

Deliverables:
Blue Book research publication; Textbook (available in the CAM-I Book Store); In person and online Implementation workshops.

The Closed Loop Planning & Budgeting methodology provides a powerful approach to improving the operational planning and budgeting processes in most organizations.

Closed loop planning and budgeting model

Applications: The Closed Loop Planning and Budgeting methodology has been extensively implemented by organizations throughout the world. A list of these organizations is provided on the CAM-I website.

© 2025 CAM-I. All Rights Reserved

19

The Full Capacity Model (Physical Assets)

Issue: Existing capacity measurements and management practices are important. However, often they do not provide enough insight into the amounts and sources of idle or nonproductive capacity

Led By: The CAM-I Capacity Management Group

Solution Development/Application:
Systematic analysis of capacity issues with practical application of the CAM-I Capacity Model

Deliverables:
Book - Capacity Measurement & Improvement Guide.
Capacity cost management paper

Full capacity model: rated capacity split into idle, non-productive and productive capacity

© 2025 CAM-I. All Rights Reserved

20

Intelligent Data Quality Management
and Business Intelligence

Issue: Existing capacity measurements and management practices are important. However, often they do not provide enough insight into the amounts and sources of idle or nonproductive capacity

Led By: The CAM-I Intelligent Data Management and Business Intelligence Teams

Solution Development/Application: create data quality and data management frameworks for better informed business decision making, improved investment analysis and allocation of appropriate funding/resources, reduced risk exposure, and controlled improvement

Deliverables:
Data Life Cycle Model
Operational Data and Cost Measurement Assessment Modular Manual
Business Intelligence - Introduction and guide to the Matrix Reference Model
Business Intelligence - Matrix Reference Model Tables
Calculating & Reporting Customer Profitability

Define > Appraise > Obtain > Transform > Store > Register > Consume > Archive > Dispose

© 2025 CAM-I. All Rights Reserved

21

Change Adaptation and Learning

Issue: Many of the published change advocates have created excellent frameworks for describing the change process, yet little on the specific actions one must take to successfully implement change. The group saw a significant gap existing between the knowledge in available “change management” literature and that which is needed to cope with the breaking waves of turbulent change that participating organizations were experiencing.

Led By: The CAM-I Change Adaptation and Learning Group

Solution Development/Application: An ability to diagnose the drivers of change within your organization and the type of change response required, a model to enable self-assessment of multiple dimensions of change responses in building a comprehensive strategy for increased organizational change capacity, a diagnostic framework for self-assessment of organizational capabilities to improve change responses.

Deliverables:
Book - Chasing Change: Building Organizational Capacity in a Turbulent Environment
Integration- The Foundation for Continuous Organizational Improvement
Management Control Systems as a Tool for Planned Organizational Change: An Assessment of Two Organizations)

This work led to development of the organizational readiness metrics for the Performance Management Framework.

© 2025 CAM-I. All Rights Reserved

22

CAM-I
Books

Target Costing:
  • Target Costing - The Next Frontier in Strategic Cost Management
  • Hitting The Target – The CAM-I Target Costing Implementation Guide
Process Based Management:
  • The Road to Excellence – Becoming a Process-Based Company
  • Process Based Management – A Foundation for Business Excellence
Planning and Budgeting:
  • The Closed Loop – Implementing Activity Based Planning and Budgeting
Change Adaptation and Learning:
  • Chasing Change – Building Organizational Capacity in a Turbulent Environment
Activity Based Costing
  • An ABC Manager’s Primer
Capacity Measurement & Improvement:
  • Guide to Evaluating & Optimizing Productivity

© 2025 CAM-I. All Rights Reserved

23

Ashok G. Vadgama
President
This email address is being protected from spambots. You need JavaScript enabled to view it.
108 Wild Basin Road South
Suite # 250
Austin, TX 78746

Phone: (512) 617-6428
Mobile: 512-296-6872

http://www.cam-i.org

© 2024 CAM-I. All Rights Reserved

24